Network :The Putrajaya Line (PYL) is the second MRT line to be introduced into the Klang Valley Integrated Transit Network. It is coloured yellow on the system map, and currently being operated by RapidRail Sdn Bhd.
Putrajaya Line is an elevated MRT line with an underground section at the city centre. With 36 stations from Kwasa Damansara to Putrajaya Sentral, the 57.7km Putrajaya Line is currently the longest automated metro line in Malaysia.
The first and second phase of the Putrajaya Line opened in 2022 and 2023 subsequently. The line mainly serves the northern and southern region of the Klang Valley.

16 Jun 2022
First Opened

57.7 KM
Total Length

41 Stations
10 Interchange Stations
PY1 KG4 Kwasa Damansara
PY2 RRI
PY3 Kampung Selamat
PY4 KA8 Sungai Buloh
PY5 Damansara Damai
PY6 Sri Damansara Barat
PY7 Sri Damansara Sentral
PY8 KA7 Sri Damansara Timur
PY9 Metro Prima
PY10 Kepong Baru
PY11 Jinjang
PY12 Sri Delima
PY13 KC3 Kampung Batu
PY14 Kentonmen
PY15 Jalan Ipoh
PY16 Sentul Barat
PY17 AG3 SP3 MR11 Titiwangsa
PY18 Hospital Kuala Lumpur
PY19 Raja Uda
PY20 KJ9 Ampang Park
PY21 Persiaran KLCC
PY22 Conlay
PY23 KG20 Tun Razak Exchange
PY24 AG11 SP11 Chan Sow Lin
PY25 Bandar Malaysia Utara
PY26 Bandar Malaysia Selatan
PY27 Kuchai
PY28 Taman Naga Emas
PY29 SP16 Sungai Besi
PY30 Taman Teknologi
PY31 Serdang Raya Utara
PY32 Serdang Raya Selatan
PY33 Serdang Jaya
PY34 UPM
PY35 Taman Universiti
PY36 Taman Equine
PY37 Putra Permai
PY38 16 Sierra
PY39 Cyberjaya Utara
PY40 Cyberjaya City Centre
PY41 KT3 Putrajaya Sentral
Select a station from the list to view the information for the station.
| Type | Medium-capacity Mass Rapid Transit (MRT) | Train Length | 4 cars |
| Length | 57.7km | Track Gauge | Standard gauge (1,435mm) |
| 44.2km (Elevated) | Power Supply | 750 V DC / Third Rail | |
| 13.5km (Underground) | Operation Type | Unattended Train Operations | |
| Stations | 36 + 5 Provisional | Grade of Automation | GoA Level 4 |
| Depots | Sungai Buloh Depot Serdang Depot |
Signalling System | Bombardier CityFlo 650 |